Back

Construction of a Hydroelectric Power Station on the Vltava River

Film Information

Please find all relevant information about this film we have on file below.

Abstract
General view of construction at the bottom of the Vltava River. Supply of cement from a cement plant to the construction of a hydroelectric power plant, placing it in the base of the turbine hall. Installation of drainage pipes; Welding of individual parts of the spillway pipes is performed by the best construction welder J. Beran. A team of fitters is working, the foreman is the best fitter in the construction, Y. Dubrava. Excavator I. Doleish is working on an excavator at excavation. Chief Construction Engineer Zdenek Palla and Engineer R. Dushek are reviewing the drawings.
Director
There is no data
Color
B&W
Film ID
17871
Keywords
construction industry
, energy
, czechoslovakia
Meterage
157
Number of Parts
1
Operators
P. Kasatkin
Other Creators
There is no data
Release Date
1952
Sound
No Sound

Search our catalogs or contact us today.