Back

Gateway Before Launch

Film Information

Please find all relevant information about this film we have on file below.

Abstract
The gateway of the Kuibyshev hydroelectric power station. Electric welder A. F. Shcheberstov at work. Installation work on the sluice gates. The head of the section for electrical work GF Sivash gives instructions to the chief engineer of the section PI Pavlov and the foreman VV Shamarin. Senior engineer of the production and technical department N. A. Komarov and senior foreman P. D. Kulikov check the switching in the devices. General views of the sluice part of the construction. Bulldozer driver A. P. Kuzin at work on cleaning the soil. Foreman ND Seliverstov at the control room. Test passage of the boat through the lock. The builders welcome the first boat.
Director
There is no data
Color
B&W
Film ID
18836
Keywords
building
, energy
, river transport
Meterage
198,8
Number of Parts
1
Operators
N. Stepanov
Other Creators
There is no data
Release Date
1955
Sound
No Sound

Search our catalogs or contact us today.