Back

Reputation

Film Information

Please find all relevant information about this film we have on file below.

Abstract
Construction of the Moscow metro. A team of tunnellers at work in the tunnel. Installation of tubing. Loading of soil into trolleys by excavators. Mine surveyors are conducting geodetic surveys. Rail laying. Brigadier drifters P. A. Novozhilov, head of the tunnel detachment K. V. Lazarevich, shift supervisor K. S. Yanchevsky talk about their work (synchronously). Grinding marble slabs in the workshop of the Mosmetrostroy plant. Stations "Pushkinskaya", "Kuznetsky most", "Skhodnenskaya", "Barrikadnaya". Passengers descend on the escalator, enter the train carriages. VA Alikhashkin, Chief Engineer of the Metrogiprotrans Institute, talks about the sectional finishing during the construction of the metro (synchronously). Opening of the Pushkinskaya station; V. Grishin, a member of the Politburo of the CPSU Central Committee, speaks (countertyp).
Director
I. Gutman
Color
Color
Film ID
25507
Keywords
urban transport
Meterage
549
Number of Parts
2
Operators
A. Kulidzhanov
Other Creators
There is no data
Release Date
1976
Sound
Has Sound

Search our catalogs or contact us today.