Cutting ice on the Angara River with an earth-moving machine and extracting it from the water with an excavator. The tractor pulls the blocks of ice aside. Descent of the ryazh into the water. Construction of the first ridge cofferdam: gravel and a stone banquet are unloaded from dump trucks into ryazh. Installation of steel sheet piles.