Back

At the Construction of the Kakhovska Hydroelectric Station

Film Information

Please find all relevant information about this film we have on file below.

Abstract
Ukraine. Alluvium with dredgers of the earthen cofferdam, which will connect the dam with the bank of the Dnieper River. The ship-dredger "Onega" works on the excavation of the hole (a temporary passage for the passage of water during the construction of the dam). Unloading the first transformer that arrived at the assembly site. Installation of the turbine impeller. Installation of the impeller in the crater of the second turbine.
Director
There is no data
Color
Color
Film ID
18846
Keywords
building
, energy
Meterage
255,8
Number of Parts
2
Operators
I. Zaporozhsky
Release Date
1955
Sound