Back

At the Construction of the Kakhovska Hydroelectric Station

Film Information

Please find all relevant information about this film we have on file below.

Abstract
Various plans for the construction of the Kakhovska hydroelectric power station. Flooding of the pit of the navigable lock, the pit of the hydroelectric dam spillway. Overlapping the channel of the Dnieper River. Dump trucks are dumping rocky soil from the pontoon bridge and from the dam. The chief of construction, S. N. Andrianov, and civil engineers monitor the progress of work on the construction of the hydroelectric power station. Film director A. P. Dovzhenko talks with a construction engineer.
Director
There is no data
Color
Color
Film ID
18821
Keywords
cinematography
, energy
Meterage
1123,1
Number of Parts
4
Operators
P. Rusanov, I. Gutman
Release Date
1955
Sound