After the Soviet troops liberated Rostov-on-Don and the Rostov region from the German invaders, the Shakhtantratsit trust at the Rostovugol combine began to restore the mines. Rostov Region, March 30-31, 1943 Territories of the mine named after the 10th anniversary of industrialization: the destroyed building of the processing plant. Clearing the shaft of the mine. Workers manually lift a bucket out of the barrel. The women are loading coal into a trolley. Reconstruction work on the territory of the mine. October revolution. General view of the destruction. View of a destroyed overpass with overturned broken trolleys. Restoration of the structure of the lifting machine: workers restore the drum of the lifting machine. Copra assembly. The foreman of the boiler-workers Kononenko and the old boiler-worker G.I. Sychev at the assembly of the copra. Workers manually load coal into a trolley, transport trolleys with coal.