Construction of the Urengoy-Uzhgorod gas pipeline on a section of the route passing through the Tula region. Pipe laying, welding. Commissioning of the first stage of the Zmievsky elevator in the Oryol region. Grain movement along the conveyor; elevator mechanisms. Making hay at the "Delo Oktyabrya" collective farm in the Spassky District of the Ryazan Region. Haymaking in the floodplain of the Oka River. Lunch of collective farmers in the field.