Back

North Caucasus Number 3

Film Information

Please find all relevant information about this film we have on file below.

Abstract
The plot of the newsreel is devoted to the construction of the Transcaucasian Highway (Transkam). The plot tells about the progress of the construction of the highway and the results of construction. The following filming was used: landscapes of the mountains, a general view of the Transcaucasian Highway and the movement of vehicles on the road, a view of one of the tunnels, the movement of cars through the tunnel; master of construction SZ Lisichkin talks about construction (sync. and behind the scenes.); used newsreel footage telling about the construction of the Transcaucasian highway: the work of a technician, tunnellers, explosives, drillers; participants in the construction of the highway, bulldozer drivers V. Oleinikov, A. Kazarin and G. Oleinikov at work, during the liquidation of the accident - raise the bulldozer out of the water; work of tunnellers of the tunnel detachment No. 15 on the construction of a ventilation tunnel through the Caucasian ridge; laying asphalt on one of the sections of the highway; the movement of cars along the Transcaucasian highway in winter; general view of the highway and cars covered with snow during a hurricane; bulldozers are working on clearing the highway from snow drifts.
Director
S. Tsoriev
Color
B&W
Film ID
35720
Keywords
building
, road transport
Meterage
280,7
Number of Parts
1
Operators
S. Tsoriev
Release Date
1987
Sound