Back

Science and Technology № 6

Film Information

Please find all relevant information about this film we have on file below.

Abstract
1syuzh. - The work of machines used during the digging of a subway tunnel in Moscow. Automatic laying of the tunnel vault. 2syuzh. - Testing of a new training aircraft designed by engineer Bedunkovich. 3syuzh. - Operation of the ballasting machine, designed by engineer Barykin.
Director
L. Zadvorochnov
Color
B&W
Film ID
2563
Keywords
mechanical engineering
Meterage
257
Number of Parts
1
Operators
A. Lebedev, N. Blazhkov, S. Segal
Release Date
1934
Sound