Please find all relevant information about this film we have
on file below.
Abstract
Descent into the sea of the foundation for drilling rigs (new design by S. A. Orudzhev and Yu. A. Safarov, as a result of this design, the term of work on installing the foundation of the drilling rig at sea is reduced from six months to 3 days.